Manufacturing And Installation Schedule for Indoor Soft Play Facilities

Views: 0     Author: Site Editor     Publish Time: 2024-10-15      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button
Manufacturing And Installation Schedule for Indoor Soft Play Facilities

One of the most important factors to consider when investing in indoor soft play areas is the production and installation schedule. Understanding this schedule helps operators effectively plan their launch or expansion, minimizing delays and ensuring a smooth process from concept to completion.


Manufacturing schedule: The production phase usually begins after the design and layout of the soft play area is completed. Depending on the scale and complexity of the project, the manufacturing of soft amusement equipment may take 4 to 8 weeks. This includes cutting, sewing and assembling soft elements such as foam slides, craters, climbing walls and interactive areas. Manufacturers also need to ensure that all materials comply with safety standards and do not contain harmful substances.


Installation phase: Once the equipment is ready, the installation process can begin. Installation usually takes 7 to 14 days, depending on the size of the project and the complexity of the layout. Large amusement parks with multiple layers, customized functions, and complex structures will require longer installation times. During the installation process, a professional team will ensure that all components are securely fixed and comply with safety regulations. They will also test each element to ensure everything runs smoothly.

Factors that affect the schedule: There are several factors that can affect the schedule, such as site preparation, weather conditions, and customization requirements. The site preparation, including power supply, suitable flooring, and available space, should be confirmed before installation to avoid delays.


Final testing and handover: After installation, the amusement park will undergo a final round of testing to ensure safety. After completing all inspections, hand over the space to the operator and prepare for opening.


For companies planning to open a new indoor amusement park, planning, manufacturing, and installation schedules is crucial. Communicating with manufacturers in advance and preparing the venue in advance can help simplify the process.


We aim to provide a soft and safe gaming environment for children, which is suitable for interactive games for children of all ages.

QUICK LINKS

PRODUCT CATEGORY

COTACT US

WhatsApp: +86 18802037490
WeChat : CYHT17999
Tel: +86-18884387833 
Email: andy@oleaoamusement.com
Add: 3rd Floor, Building A, No.18 East Shiling Avenue, Huadu District, Guangzhou
Copyright © 2024 Guangzhou Oleao Amusement Equipment Manufacturing Co., Ltd. All Rights Reserved.| SitemapPrivacy Policy